Date:
10-06-2015
Change / Revision Date:
11-01-2019
Series:
3 - DISCIPLINE-SPECIFIC CRITERIA
3-500: ELECTRICAL
Status:
Active
The purpose of this UFC is to provide technical requirements for general aspects of the electrical design of projects. Apply the criteria provided in this UFC for the development of the plans, specifications, calculations, and Design/Build Request for Proposals (RFP). It serves as the minimum electrical design requirements for design-build and design-bid-build projects. Project conditions may dictate the need for a design that exceeds these minimum requirements.
Page(s):
93
View/Download:
Criteria Change Request:
Superseded Version(s):
Federal Facility Criteria:
Topics: