H-18-8 Seismic Design Requirements  

Date: 
11-01-2019
Change / Revision Date: 
05-01-2020
Status: 
Active

These requirements were developed with the concept that all VA Essential Facilities must remain in operation after an earthquake and were far in advance of National Codes.

Page(s): 
26
Topics: